Collavino Northeast Construction

“This letter is to inform HI-LITE systems of Collavino’s success at meeting our schedule restrictions for a fifty story casino building utilizing HI-LITE’s fly-form I table system and aluminum post shores,

Collavino had begun the typical levels of the tower in early July 2001 and was required to complete all typical floors within fifty-two weeks of our start date. As of June 19, 2002, all typical floors were completed and roof construction was beginning.

Construction of the typical floors could have been completed sooner however our operations had lost roughly twenty-four working days overall throughout the course of. In order to achieve our schedule Collavino’s crews consisted of twelve employees during the day and eight employees on an evening shift, however this was due to the difficult floor plane that we were required to construct, if the building footprint was less complicated a second shift would not have been required.

In conclusion, Collavino was extremely pleased with the performance of the equipment purchased from HI-LITE to construct the typical floors. Collavino thanks HI-LITE for their professionalism in coordinating the layouts and taking the time to train our employees how to use this system effectively and efficiently In order to allow for the best possible production and performance.”