I-90/Route 1A Intersection, Boston MA, US
Project Gallery
Project Details
The Project: | The Boston Big Dig | |
Description: | Extension of Massachusetts Turnpike | |
The Challenge: | Largest highway project ever built in North America Variable production schedule Multiple governments involved |
|
The Result: | Over 70% of the poured concrete slab was supported by HI-LITE’s 25K Aluminum Shoring System. The project was completed two months ahead of schedule largely due to HI-LITE systems and equipment. |