Our Projects
Shoring Systems
Cinema Gaumont Disneyland Paris, France
The Project: Cinema Gaumont Disneyland Paris, France Contractor: Hunnenbeck France Project Statistics: Slab Thickness: 0.46m; Slab Height: 10-20m Description: North American Products in prestigious European Projects The Challenge: Heavy slab high in the air The Result: With the 12K system, frames were easily erected and dismantled by hand. Frames were easily climbed for fine adjustment […]
Read MoreRichardson International Airport, Winnipeg MB, Canada
The Project: Richardson International Airport, Winnipeg MB, Canada Description: As part of a major site redevelopment project, the Winnipeg Airport Authority undertook the construction of a new airport terminal. HI-LITE 12K Shoring and 25K Modular Shoring Frames were chosen due to their easy handling, quick assembly, stripping, versatility, high resistance to damage, and durability in […]
Read MoreI-90/Route 1A Intersection, Boston MA, US
Description: Extension of Massachusetts Turnpike.
The Challenge: Largest highway project ever built in North America Variable production schedule Multiple governments involved.
Eagle Creek Core Tower Victoria, BC, Canada
SHORING Eagle Creek Core Tower Victoria, BC, Canada 12K Shoring Systems Contractor: Scansa Construction Ltd, Year of Construction 2015
Read MoreFly Form Systems
Harrah’s Hotel and Casino – Atlantic City NJ, USA
Description: 50 story tower.
The Challenge: To make a 76’ long flying form table usable in a 9’ section of a 16’ typical floor without changing the diagonal struts.
Borgata Hotel, Casino & Spa
Description: 50 story hotel and casino.
The Challenge:Produce 73’ long table.Fly 73’ long panel from non-typical to typical floors – 48 floors.
Singapore Drop Leg Project
40-storey Luxury Apartment Building in Downtown The project was completed well before the estimated date. Quick cycle time was achieved, meaning fewer re-shores and man hours.
Read MoreResidential Project in Ukraine, city of Ternopil
This project involved 12 floors of a residential building. Construction Company “DOBROBUD” This was the first time HI-LITE’s equipment was used in Ukraine. It was the most economical equipment they ever had, letting them achieve a four day cycle per floor and complete the project ahead of time.
Read MoreAluminum Drop leg Fly Forms, Chennai, India
Project Description: Cognazant IT Park built by Larsen & Toubro To get the advantage of large area tables, HI-LITE’s Drop Leg Aluminum System was selected. Large Area tables of size 50’ x 22’ (15.24m x 6.7 m) were made to fly as one unit from one floor to another and one building to another building – […]
Read MoreAluminum Bridge Overhead Brackets
Athabasca River Bridge, Ft. McMurray, AB, Canada
The Athabasca River Bridge has the largest bridge deck in Alberta.
Read MoreI-95 Overpass, New Haven CT, US
The project involved the completion of several bridges and overpasses on I-95.
Read MoreScaffolding
Princess Margaret Bridge, Fredericton NB, Canada
The refurbishing of a 2-lane 1km long bridge with 17 spans crossing the St. John River.
Read MoreAccess Trusses
Old Kootenay Channel Bridge, Cresten, BC, Canada
ACCESS TRUSSES Old Kootenay Channel Bridge Cresten, BC, Canada Access Truss System Contractor: SEISMIC 2000 CONSTRUCTION LTD, Under Construction
Read More